APPLICATION
SPECIFIC TOOLS.
SAFE. DURABLE.
EXCEPTIONAL.
We specialize in designing and manufacturing the safest, most durable specialty tools that outperform in critical, high-stakes applications. LEARN MORE
LINEMAN-GRADE
HUSKIE TOOLS.
ENGINEERED
TO PERFORM.
Industry leading light and durable inline power tools, including a patented all-in-one cutting and crimping head option perfect for sub-station to service entry applications. LEARN MORE
LIVE LINE
WORK TOOLS.
MAXIMUM
PERSONAL PROTECTION.
Injection-molded insulated tools that are over-engineered to be safer, more durable and last longer even under the harshest of conditions. LEARN MORE
POWER. LEVERAGE. EFFORTLESS
CABLE BENDING.
Bending large gauge electrical cables is challenging, especially in tight spaces. Bulldog Bender gives you the power and leverage to easily install, bend and terminate cables in service panels, LB conduit bodies, switchgear, motor controls, wireways and meter bases. LEARN MORE
MAXIMUM
RESULTS.
10X FASTER. The Jameson Fiber Driver’s patented design is a game changing invention that pushes fiber cable 300 feet in less than 30 seconds using any ordinary power drill. LEARN MORE
/ next subdirectory_arrow_right subdirectory_arrow_left prev

Exceptional Utility-Grade Electrical and Fiber Tools

Tools for Cable Termination, Power Management and Battery Banks

Tools for Electrical, Fiber and Coaxial Cable Installation